What does home EV charger installation involve?
Some links in this guide are affiliate links. If you buy through them we may earn a commission, at no extra cost to you. More about how we're funded.
Getting a home charger fitted is usually far simpler than people expect. For most houses with a driveway it's a single visit lasting a few hours, with no building work. But a few things can add time or cost, and it helps to know what they are before you book.
This guide walks through the whole process, from the first survey to the paperwork at the end.
Quick answer
- Installation must be done by a qualified electrician, ideally an approved installer for the charger you've chosen.
- Most jobs start with a survey (often just photos you send in), then a visit of around 2 to 5 hours.
- A standard installation typically costs about £800 to £1,200 including the charger. Long cable runs, fuse box upgrades or groundworks cost extra.
- In England, most driveway chargers don't need planning permission. Listed buildings and the rest of the UK can be different.
Can I install a charger myself?
No. A home charger is a high-power circuit, and in the UK it has to be installed by an electrician registered with a government-approved competent person scheme such as NICEIC or NAPIT. Most charger brands also require an approved installer for the warranty to be valid, and you'll need one if you're claiming a grant.
Step 1: the survey
Before giving you a firm price, the installer needs to understand your electrics. Many now do this remotely: you send photos of your fuse box (consumer unit), electricity meter, main fuse and where you'd like the charger. Some will visit instead.
They'll check:
- Your main fuse. Most UK homes have a 60A, 80A or 100A supply, which is usually enough for a 7kW charger alongside normal household use. Smart chargers can also turn down their charging speed automatically if the house is using a lot of power.
- Your fuse box. It needs space for a new circuit. Older consumer units sometimes need upgrading or a small separate unit added.
- Your earthing. More on this below.
- The cable route. How far the charger is from your fuse box, and whether the cable can run along walls or needs to go underground.
Ask for anything unusual to be flagged at this stage, so the price you're quoted is the price you pay.
Step 2: installation day
A typical installation takes around 2 to 5 hours. The electrician will:
- mount the charger on the wall (or on a post, if it's away from the house)
- run a dedicated cable from your fuse box to the charger, usually clipped neatly along walls or in trunking
- fit the protective devices the circuit needs, such as a circuit breaker and residual current protection
- deal with the earthing arrangement
- test everything, connect the charger to your Wi-Fi or mobile signal, and show you how to use the app
Your power will be off for part of the visit, so plan around freezers and anyone working from home.
About earthing (and earth rods)
Most UK homes use an earthing system where a rare fault on the electricity network could make a car's metal body unsafe to touch. To protect against this, a charger needs either built-in protection against that fault (often called PEN fault protection) or a metal earth rod driven into the ground next to it. Many modern chargers have the protection built in, which avoids the rod and usually makes the job quicker and tidier. It's worth checking when you choose a charger. See our home charger comparison.
Step 3: notifying the network operator
Your local Distribution Network Operator (DNO) is the company that owns the cables and main fuse up to your meter. Every home charger has to be reported to it. For a standard 7kW single-phase charger, your installer usually just notifies the DNO within 28 days of the installation. Larger, three-phase or vehicle-to-grid installations need approval from the DNO before the work goes ahead, which can take several weeks.
Occasionally the DNO needs to do some work first, for example if your house shares its electricity supply cable with a neighbour (a "looped" supply). Your installer will tell you if this applies.
Step 4: the paperwork
When the job's finished, you should receive an Electrical Installation Certificate confirming the work meets the wiring regulations, and the installer should register the work with building control through their competent person scheme. Keep these documents safe, as you may need them when you sell your house.
Do I need planning permission?
In England, a standard wall-mounted or freestanding charger on your own driveway has been permitted development since May 2025, meaning no planning application is needed in most cases. Since 21 October 2026, households in England without a driveway also no longer need planning permission for a cross-pavement charging channel to run a cable to a car parked on the street, although the council still has to approve the channel itself.
You may still need permission if your home is a listed building, and the rules are different in Scotland, Wales and Northern Ireland, so check with your council there. If you rent or live in a flat, you'll need permission from your landlord or freeholder too.
How much does installation cost?
A standard installation typically comes to roughly £800 to £1,200 including the charger itself. Many charger brands sell a fixed-price package covering a standard installation. Costs go up if you need:
- a long cable run, often charged per extra metre beyond around 10m
- a consumer unit upgrade
- an earth rod (if your charger doesn't have built-in protection)
- groundworks, such as digging a trench across a driveway
- a three-phase supply for a 22kW charger, which few homes have
Renters and flat owners may be able to claim a government grant towards the cost. Our charger guide explains who's eligible.
Questions to ask your installer
- Are you registered with a competent person scheme, and approved by the charger's manufacturer?
- What does your "standard installation" include, and what would count as extra?
- Will I need an earth rod or a fuse box upgrade?
- Will you handle the DNO notification and building control registration?
- How long is the warranty on the installation, separate from the charger?
Ready to choose a charger?
Most installations are booked together with the charger itself, so start with the charger that suits your home and tariff.
Compare the best home EV chargersFrequently asked questions
How long does it take from ordering to installation?
Often around one to three weeks, depending on the installer's availability and whether your property needs any extra work or DNO approval.
Can the charger go inside my garage?
Yes, and that's often simpler as the cable run may be shorter. Just make sure the charging cable will reach your car's charging port comfortably.
What if I don't have a driveway?
Cross-pavement charging channels are becoming more common, and in England they no longer need planning permission, though your council still needs to approve them. Otherwise, a nearby public or workplace charger may be the best option. See our guide to charging without a driveway.